High
GMV6 — Loss of synchronization (desynchronizing) protection of the inverter compressor (shown on the 2-digit LED of the outdoor unit's main board; sub-code of P0).
Gree P9: Loss of synchronization (desynchronizing) protection of the inverter compressor (shown on the 2-digit LED of the outdoor unit's main board; sub-code of P0). This fault noticeably affects operation.
Possible causes
- The compressor drive board operates improperly.
- The compressor is damaged.
Check steps
- Check that the U, V and W phases of the compressor leads are connected properly.
- Check the winding resistance of each phase (typical per manual: below 2 Ω, “generally”), that the values are equal, and the insulation of the windings to earth (typical: above 2 MΩ); if abnormal: replace the compressor.
- Check whether the system is clogged and whether the valves are open; if necessary remove foreign matter and open the valve.
- Check the system control valves (e.g. balance valve operates normally, control terminal plugged in properly).
- If other faults occur at the same time (e.g. PJ, P6, P5): the compressor is damaged and, per manual, should be replaced; otherwise the compressor drive board is abnormal – replace it.
Affected parts
- Verdichter
- Inverter-Platine
Safety note
Manufacturer warning (manual PDF p. 12): before performing operations on the unit (such as commissioning, maintenance and repair), shut the unit down and cut off the power; use a suitable instrument to ensure that the voltage at the power input terminals is zero and that the power indicator on the main board is off. Otherwise an electric shock or injury may be caused. Manufacturer note (ibid.): in standby the power indicators on the main board and the drive board are on. Manufacturer prohibition (PDF p. 12): never connect the compressor directly to the mains. General safety note (not from the manufacturer's manual): secure against reconnection. Lit or unlit indicators alone are no proof of absence of voltage. Dangerous voltage (DC bus) may remain on the drive board/IPM after switch-off; the manual gives no general discharge time. The absence of voltage must be confirmed by measurement on site by a qualified electrician or specialist contractor. The steps reproduce the manufacturer's troubleshooting and are not a binding work instruction; any parts replacement is decided on site by the specialist contractor/Meister. Winding and insulation measurement: at this point the manual does not specify the test voltage, the instrument or disconnecting the leads from the drive board – to be determined by the specialist contractor; applying an insulation test voltage to a connected drive board can damage it. The resistance figures are typical manufacturer values (“generally”/“normally”), not fixed limits. Operate valves only after checking the pressure condition with a gauge. Work on the refrigerant circuit (e.g. charge, EEV, compressor) only by appropriately certified personnel in accordance with the applicable regulations; do not vent refrigerant to the atmosphere – recover it.
Source: Gree GMV6 DC Inverter VRF Units Service Manual GC202005-I (AB, 380-415V 3N~ 50/60Hz, GMV-224…615WM/H-X), Fehlerliste PDF s.70-73, Abschnitt 2.133 PDF s.167-168 (basılı 165-166); Warnhinweis PDF s.12 (basılı 10)
Reviewed by Anıl Güzeldemir — in the refrigeration machine room since 2005, developer of Enthalio.